Latest posts

Technical University of Munich – Straubing Campus

Flexible solutions for special requirements

A comprehensively equipped laboratory in modular construction was realised in 2022 for the Technical University of Munich in Straubing. Today, on an area of approximately 1,500 sqm, customised furnishing components ensure optimal study conditions at the Straubing campus – an integrative research centre for biotechnology and sustainability. TUM has been a loyal Köttermann customer for around a decade. Existing laboratory facilities from us are continuously supplemented with new elements. The people in charge appreciate the fact that extraordinary wishes can be implemented in individual solutions. The selection criteria for laboratory equipment from Köttermann are always the durable material steel and the company’s sustainability strategy.

Location: Straubing
Size: 1500 Square metres
Year of realisation: 2022

Products

In the laboratory of the Technical University of Munich at the Straubing site, the following components from the EXPLORIS® product line, among others, were planned and assembled:


Commercial and Domestic School Horb

Unique furnishing solution for innovative teaching.

In Horb on the Neckar, an unusual school laboratory facility has been created: A visionary teacher wanted a cooperative learning environment that would put her as a teacher at eye level with the students. The request for a teacher’s lab table in the middle of the room could be realised thanks to the octagonal corner solutions of the student workstations. The pupils can also communicate with each other almost without obstacles thanks to the transparent service cell glass inserts. The service columns are produced in a filigree design especially for this purpose – made possible by the basic material of the Köttermann laboratory equipment, steel. The digital way of working in the lessons required practical storage devices for the tablets. The simple holders leave enough space for experimenting and allow ergonomic working. Here, too, steel offers the advantage of an extremely thin product design and easy cleaning during use.

Location: Horb on the Neckar
Size: 60 square metres
Year of realisation: 2022

Products

In the laboratory at the commercial and domestic school in Horb, the following furniture from the EXPLORIS® product line was planned and assembled, among others:


Papierfabrik Palm in Aalen

Laboratory equipment as part of a large-scale project

The Palm paper mill in Aalen wanted a customised laboratory furnishing solution. The company, located east of Stuttgart, is one of the world’s leading manufacturers of newsprint and corrugated base paper made from recovered paper. As part of a large future-oriented new plant construction and infrastructure project, a new paper mill was built at the headquarters at a cost of about half a billion euros. A new paper machine for the production of corrugated base papers, which are used for sustainable packaging, formed the centrepiece of the project. A new laboratory measuring 130 square metres was built in the new corrugated board factory for this purpose. One of the existing laboratories was already equipped with Köttermann equipment. The resilience due to intensive use in the sewage treatment plant sector was the decisive reason for Palm to enquire again.

Location: Aalen
Size: 130 squaremeter
Year of realisation: 2021

Products

In the laboratory of the Palm paper mill in Aalen, the following components from the EXPLORIS® product line, among others, were planned and assembled:


Hamburg University of Technology

Laboratory for research and contract work of the Institute for Environmental Technology and Energy Economics in Hamburg-Harburg

With a modern design, a great all-round service and steel as a core argument, we were able to set up over 700 square metres of laboratory space in the Hamburg Innovation Port, located on a canal on the Süderelbe. Now nothing stands in the way of the Institute for Environmental Technology and Energy Management for wastewater and solids analysis at the new location of the Hamburg University of Technology (TUHH).

Ort: Hamburg-Harburg
Size: 700 squaremeters
Year of realisation: 2020

Products

In the laboratory of the Technical University of Hamburg the following products from the EXPLORIS® product line were planned and installed:


Radiation clinic of the University Hospital Erlangen

Complete furnishing of the laboratory building of the radiation clinic at the University Hospital Erlangen

The radiation clinic in Erlangen is one of the most modern radiation therapy centres in Germany. In the treatment of malignant diseases the focus is on holistic care. This requirement also applied to the new laboratory – an all-round service, the result of it is a modern research environment. All product groups, from fume cupboards, media and hazardous material cabinets to classic laboratory furniture are used in Erlangen on an area of around 300 square metres.

Location: Erlangen
Size: 300 squaremeter
Year of realisation: 2020

Products

In the laboratory of the radiation clinic in Erlangen the following components of the product line EXPLORIS® were planned and assembled among others:


Spessart grammar school Alzenau

Chemical preparation room at the Spessart grammar school in Alzenau

The furnishing of classrooms makes us all travel back in time – especially when the old furniture is still in it. We are all the more pleased about the newly equipped chemistry preparation room at the Spessart grammar school in Alzenau. The safe and space-saving design makes the students’ daily research work easier. Teachers are given their own experimental laboratory bench and gas cylinders can finally be stored safely.

Ort: Alzenau
Size: 80 squaremeters
Year of realisation: 2020

Products

In the chemistry preparation room of the Spessart grammar school in Alzenau, the following components from the EXPLORIS® product line, among others, were planned and installed


Münzing Chemie

Laboratory for the production of paints and varnishes

The safety of the employees during the testing of high-quality additives for the paint and lacquer industry as well as for the paper industry and metalworking is a top priority for Münzing Chemie in Abstatt. Köttermann was able to score points with a well thought out safety concept. In addition, individual colouring and service from initial contact to regular maintenance were further important aspects.

Ort: Abstatt
Size: 1000 squaremeters
Year of realisation: 2015

Products

In the laboratory at Münzing Chemie in Abstatt the following components from the EXPLORIS® product line, among others, were planned and assembled:


Ludwig Fresenius Schulen Dortmund

Chemical and galenics laboratories for the Ludwig Fresenius vocational school in Dortmund.

Our main field of activity is the basis for research, progress and education. We have been able to create an enriching learning environment for the trainees as pharmaceutical as well as biological technical assistants at the Ludwig-Fresenius schools in Dortmund through flexible special solutions. Köttermann’s service cells played a major role: Their open construction ensures a safe working environment and a good overview of the work tables. The vertical arrangement of the media additionally improves the work structure and organisation.

Ort: Dortmund
Size: 1000 square metres
Year of realisation: 2020

Die Produkte

At the Ludwig Fresenius schools in Dortmund, the following components from the EXPLORIS® product line were planned and installed, among others: